https://oceanstrider.co.uk/google-site-verification: googlee146a5b744c3fdc7.html

Christmas Day, presents opened. In the workshop all day…

Update: Project Kawasaki H1A, 500 triple: Forks built and filled with oil, new headrace and wheel bearings, front brake shoes re-lined and like new, new front tyre. Nuts and bolts to replace, if I can find them! And that’s just for starters!!!

Kawasaki H1A restoration continued.

Kawasaki H1A Restoration continued. The dreaded Covid 19 is really slowing things down. The parts I sent for various services are taking their time to come back. Some have been 3-4 months late and parts are even worse. Here’s the latest up-date. I’ve been working 7 days a week, so not had loads of timeContinue reading “Kawasaki H1A restoration continued.”